We have come to what appears to be about the last to weeks of the project! We are right on track for the 4th of July target I have kept in the back of my mind. It is exciting to see a very bright light at the end of the tunnel. We have had a few speed bumps along the way but have hot hit any road blocks. At the end, it is going to be all worth it!
Below are a few photos from today...
|
Bathroom floor with stone base molding |
And the bedroom...
|
Pendant light for next to each side of the bed |
|
Looking into the walk in closet from the bedroom |
|
|
And the utility room...
|
Temporary location sitting on a 2x4 blocks to keep level and balanced |
|
Mitchell's "MARTHA" cabinets! Just need counter top installed |
|
Marmoleum floor in utility room. It is much more green than it appears here. |
|
|
|
|
And the new den/TV room...
|
This is going to be our "bar" |
|
From TV room looking down hall to bedroom |
No comments:
Post a Comment